Document describing the Upgraded LAPD is yours for the clicking!
|
|
|
|
|
|
|
|
68 magnets + 22 new |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pictures of the LAPD Upgrade Construction
Click on them for a larger jpeg image
![]() |
|
![]() |
End chamber which will hold a cathode at Dan's Machine Shop, Compton California. Oct 1998 Holes for flanges are being bored |
![]() |
|
![]() |
|
![]() |
The LAPD upgrade dwells in a radiation-and earthquake proof basement. |
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
The best in LA and who had 0.25" clearance at the top of whilst moving in the substation (714-712-5888) moving in the power supplies |
![]() |
Down the Hole |
![]() |
|
![]() |
making money and having fun |
![]() |
( 4 Megawatt DC) Lined up and waiting for the juice Janurary 1999 Powersupplies designed and manufactured by
PO box 9210 S. Burlington, Vermont (802)860-7200
|
|
April 2000 |
|
![]() |
|
![]() |
450 ports welded on the machine, NO LEAKS Weld Labs PO Box 629 Santa Monica CA 90406 (310) 674-8886 |
![]() |
March 2000 |
![]() |
When finished, there will be 66,000 pounds of them. |
![]() |
Base pressure 3X10-7 TORR !!! without discharge cleaning or heating |
![]() |
In the summer of 2000 many a happy day was spent attaching the bussbars to the 5 foot thick walls Bussbars manufactured by |
![]() |
|
![]() |
|
|
|
![]() |
|
![]() |
|
|
December 2000 1 meter diameter cathode at 600C, The cathode is very uniform in temperature (1 degree difference across its surface) thanks to an intricate reflector and heat shield design by David Leneman after_shutdown.JPG |
|
On December 10 2000 at 7:49
PM The LAPD was shut down after 11 years of operation. It will
re-emerge as the LAPD UPGRADE THIS SPRING. The last cathode worked
continuously for 4 months or 8,162,791 shots. During the last
4 months the following experiments were done: b) Field line resonances c) Propagation of shear waves in density gradients d) Plasma edge turbulence e) Plasma flows in density gradients d) Laser target experiments which generated Alfven waves |
||
|
On the Job Dave, Mark, Larry, Sal, Jo Jo, Joel, Steve and Ken |
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
|
There was a roomful of magnets just waiting to be tosssed (with precision) onto the machine |
||
|
80% of the magnets have been painstakingly placed and aligned on the new chamber |
||
![]() |
The Finished LAPD Device Quality research
Plasma is attained in October 2001
|
|
![]() |
A Neon Plasma (11 Kiloamp discharge)
18 meters long, viewed end-on
|
|
|
On Nov 1, 2001 UCLA sponsored a tour of its plasma physics program for the American Physical Society Plasma Physics Division. Approximately 150 scientists visited the LAPD upgrade device. The machine is now the core of a user facilty sponsored by NSF/DOE and ONR. |